Draft Charge: Review the Level 2 Trigger project as described in the Technical Design Reports and report in writing to the Upgrade Project Managers and the Spokespersons. This Review will cover Level 2 Global and the Calorimeter Preprocessor, as well as their components: Alpha processor, Magic Bus Transceiver (MBT), Second Level Input Computer (SLIC) and Fiber Interface Converter (FIC). Other Preprocessors will be dealt with in subsequent specific reviews administered by the Trigger Manager directly. The Review should be based on the written TDRs, presentations by the Trigger group and discussions during the Review. You should consider whether the design and implementation of the system is consistent with the physics goals of the experiment in Run II, including possible expansion of the system to accommodate STT triggers. You should explore the system design to determine whether it is comprehensive and sound. Does it accomplish the goals efficiently and in a cost-effective manner? Please include the following topics in your deliberations: Bandwidth capability Error detection, recovery Event buffering Trigger bit hierarchy, relationship to Level 1 Downloading and verification of same Debugging and evaluation of trigger performance All the Level 2 documentation you ever dreamed of can be found at: www.pa.msu.edu/hep/d0/l2 Thanks - Jim Christenson 630-840-4894